Hi,
I'm tasked with planning an FTE reduction and showing the results to senior leadership. I'm almost done however, I am a little stuck.
Based on 9800 calls per week, an SLA of 85% w/in 45 seconds and shrinkage of 40% I've been able to caculate an overall staffing required of 88 analysts (we currently employ 71 and I need to shrink to 50).
Erlang C tells me I need 15 analysts per hour to meet my SLA.
So my question is: If Erlang C tells me I need 15 analysts per hour, what does that equal for total FTE head count? When forecasting reduction, it is easiest for me to figure results if I calculate 14 FTE per hour, 13 FTE per hour, etc. However I'm struggling with the overall numbers and how our center will be affected.
Please help if you can.
Pamela |